How the Custom Injection Molding Process Works, Step by Step
Step 1: Get a Quote Ready in 2 Business Days
- Send a print or CAD model to start (STEP plus a PDF drawing works best)
- Itemized quote ready in 2 business days
- Molding and CNC machining quoted by one supplier
- Tooling transfers accepted if you already own a mold
- NDAs supported; ITAR projects are flagged before any controlled data is sent

Step 2: DFM Review Before Steel Is Cut
- DFM review before steel is cut, against your print or CAD model
- Draft angles, core pulls and wall thickness
- Material choice, fill time and cool time
- Ribs added where the part needs strength
- Molding and CNC needs reviewed together, with fewer handoffs
Step 3: Tooling Built for Your Part, or Transferred In
- New tooling starts after DFM approval
- Mold transfers accepted: bench maintenance, then a trial run
- You always own the mold; we store it in our warehouse
- Molds run on 32 presses from 45 to 390 tons
- Overmolding and insert molding tools supported


Step 4: T1 Samples Checked Against Your Print
- T1 samples from the new or transferred tool
- Checked against your print before production
- You get a report, samples and CMM data when a print is available
- PO to T1 typically 4–6 weeks, depending on tool complexity and size
- Feeds the first article inspection in Step 5
Step 5: First Article Inspection and Mold Qualification
- First article inspection against your print, with the report shared
- AS9102 FAI for aerospace and defense programs
- PPAP and ISIR qualification when required
- IQ/OQ/PQ for medical device programs
- CMM and optical inspection, in-process checks at set intervals and ERP lot traceability


Step 6: Production With Process Monitors, 24/7 When Demand Requires
- 32 molding presses, 45 to 390 tons
- Runs 24/7 when demand requires
- Process monitors shut a press down if the process drifts
- 7 CNC machines (5-axis and mill/turn) for machined features
- 33,000 sq ft in Delray Beach, FL
Step 7: Packaging, Shipping and Lot Records
- Assembly, pad printing, kitting and packaging under one quality system
- Lots ship with CoC and material certs as specified
- Quality and lot control records kept 5 years
- Longer record retention on request
- Molded and machined parts from one supplier, with fewer handoffs

Why Buyers Choose Plastimold
Industries We Serve


Built for Regulated Programs
Custom Injection Molding Process FAQ
Seven steps: quote, DFM review, tooling, T1 samples, first article inspection and qualification, production, and packaging and shipping. Each step is checked before the next one starts.
Send a print or CAD model with your volumes, resin and timing. When the package is complete, your quote is ready in 2 business days.
From PO to T1 samples typically takes 4–6 weeks, depending on tool complexity and size.
T1 samples are checked against your print, and you get a report, samples and CMM data when a print is available. A first article inspection follows, and new tools are qualified per PPAP, ISIR, IQ/OQ/PQ or AS9102, depending on the customer and industry.
Yes. A transferred mold gets maintenance on the bench first, then a trial run. Parts go to you for approval, and we build a QA plan around the samples. Once the parts are approved, the mold moves into production.
You always own the mold. We store it in our warehouse.
No, there is no MOQ. The fixed cost of a mold typically pays off at around 1,000 parts.
Yes. Our quality system is AS9100 certified, ISO 9001 certified and ISO 13485 certified. We are ITAR Registered and FDA Registered, with CMMC Level 2 and CAGE code 5ETU6.
Quality and lot control records are kept 5 years, or longer on request.







